State-owned power utility Elektroprivreda Srbije (EPS) has issued a tender for professional supervision and consulting services for the development of self-balancing solar power plants. The contract is valued at approximately 5.5 million euros, with the deadline for applications set for 5 May.
[pdf] Luxembourg City''s new energy storage project tender has become a hot topic in Europe''s renewable energy sector. With a planned capacity of 120MW, this initiative aims to stabilize the grid as solar and wind power generation increases.
[pdf] Neom's utility subsidiary, Enowa, is expected to issue the request for proposals (RFP) for a contract to develop and operate the first phase of Neom's pumped hydropower storage (PHS) network in the fourth quarter of 2024.
[pdf] China Electric Equipment Group has published the results of its 2025 centralized procurement for energy storage cells, with almost the entire 7,248 MWh tender awarded to 314 Ah products. The tender was divided into 10 packages, the tender covered cell capacities of 50 Ah, 100 Ah, 280 Ah, and 314 Ah.
[pdf]