The project involves the design, supply, installation, testing, and commissioning of a 10 MW solar photovoltaic (PV) plant integrated with a 20 MWh battery energy storage system (BESS) and a 33 kV evacuation line. The hybrid system will be developed on a 290-hectare site in Garowe, Puntland.
[pdf]