The agreement was signed in July 2025, and construction is expected to be completed by 2026. Chairman of BEL’s Board of Directors, Andrew Marshalleck, said the initiative marks a significant milestone in the country’s renewable energy agenda.
[pdf] Lebanon signs agreements with CMA CGM to build three solar power plants, increasing clean energy production, reducing costs, and creating local job opportunities. BEIRUT (Enmaeya News) — September 25, 2025
[pdf] The two companies announced on 4 November that their jointly operated business is constructing a 30MW/125MWh BESS at the Sonnedix solar PV plant in Kyushu, southern Japan. Construction began in October 2024, and the partners are scheduled to bring it into commercial operation in November 2026.
[pdf] AES just completed the first half of Bellefield, which will become the largest solar + storage facility in the US. The 1,000-megawatt (MW) Bellefield 1 project in Kern County, California, includes 500 MW of solar and 500 MW of four-hour battery storage, all under a 15-year contract with Amazon.
[pdf] NTPC Renewable Energy Ltd (NTPC REL), an arm of India’s largest integrated power utilities, NTPC Ltd, has invited bids for the engineering, procurement and construction (EPC) package to develop a 100 MWh vanadium redox flow battery energy storage system (BESS) at the Khavda Solar Park in Gujarat.
[pdf] What certifications should solar containers have? Learn the key standards like IEC, UL, CE, and UN38.3 that ensure safety, compliance, and international deployment success.
[pdf]